Re-Production were tasked with transforming the galleries loading bay into a 3000 capacity club. The Underground would transform from a one-off show to a regular club bringing it's own challenges. We had to increase the production levels on the show, minimise set up time and maintain the primary function of the space as a loading bay. We also had to facilitate large touring productions and effectively plan and communicate the unique challenges of the venue.
We developed a team of well-practised and technically brilliant staff, we can now build a two-stage venue with all the required infrastructure in just 4 hours. Using previsualisation and advanced CAD techniques we can plan out the space, communicate the design to the staff even before a flightcase has been loaded onto a van.
The basic venue spec:
Audio
2 x Danley J3
6 x BC415
2 x TH118XL
2 x SH69HT
A&H Avantis control
Lighting
16 x Chuavet 1L beams
8 x Ayrton Diablo
8 x Robe Spiiders
8 x Colour Strike M Strobes
Avolites Control
And that's just stage 1!
We have pulled of a succesful autumn winter season with performances from Mall Grab, DJ EZ and MK. Production has been slick and on top not only geting our production in but helping touring sound systems work in the space too.